Intergrated Agricultural
Development Project (Kedah Valley) is a Government project t odevelop the
Kedah Valley. The project will involved the construction of 17 rural roads,
totaling 80km in length and will include 2 prestressed concrete bridges.
Perunding Bakti was involved
in the detailed design, preparation of drawings and tender documents. |
INTERGRATED AGRICULTURAL
DEVELOPMENT PROJECT
Prestressed bridge |
|
KAPAR INTERCHANGE-NORTH
KLANG STRAITS BYPASS connects nothern Klang to the Federal Highway. This
project is intended to reduce
traffic congestion in the town of Klang and during the rush hours. Its
covers 331km of bridge
and 200m of road leading
up to the bridge. Perunding Bakti designed the entire project, including
drainage and electrical works. |
 |
|
INTERGRATED AGRICULTURAL
DEVELOPMENT
PROJECT
Roads location map |
|
EAST-WEST HIGHWAY, SEGMENT
W7-KULIM-BUTTERWORTH is a proposed dual and single carriageway
extending for over 32km
in te Kulim-Butterworth region. This highway will be linked by eight bridges.
It is designed to make
the Kulim Industrial area
more accessible to heavy traffic. Additionally, the highway is part of
the extension of the western
sector of the East-West
Highway to Prai Industrial area.
This project is a joint venture
with other local and overseas consultants. The scope of work covers a comprehensive
feasibility
study and design of the
highway. |
 |
|